Powered Land for Modular Compute

Skip the wait for power.

The PowerPad: a standardized, energized 25MW pad for modular compute, delivered on a ground lease. Distribution-connected, under 75MW, no transmission queue; first power in eight to twelve weeks from site delivery.

View the Portfolio Speak With Us
7+
Sites under development at any given time
700 MW+
Portfolio pipeline
8–12
Weeks to first power *
* Modular deployments, from site delivery of a completed PowerPad. Why timing wins →
25 MW
First-phase power · pre-engineered to expand
Modular medium-voltage transformation on a concrete pad at dusk
The Thesis

Power is the constraint. We remove it before the tenant arrives.

01 — Portfolio

Anchored in Texas.
Built for North America.

Seven-plus sites under development at any given time, a 700MW+ tracked pipeline, and access to 40+ partner sites across 20+ states and Canada through industrial landowner partnerships.

Portfolio Footprint Under development — 7+ sites Pipeline markets — 700+ MW tracked Partner site access — 20+ states & Canada Exact locations disclosed under NDA How interconnection works →
7+
Sites under development at any given time
700 MW+
Portfolio pipeline
40+
Partner sites · 20+ states & Canada
Inter-site spans of 15–20 miles carry roughly 0.12–0.16 ms one-way latency on leased metro dark fiber with tenant DWDM.
02 — The Platform

The platform is
the PowerPad.

A standardized, pre-engineered energized pad, leased to tenants deploying modular compute and repeated site after site.

I

PowerPad Deployment

Active

The PowerPad standard deployed at scale on a standardized ground-lease model: TPDS delivers the energized pad, the tenant lands modular capacity on it in weeks.

ProductGround lease + energized pad
First phase25 MW · pre-engineered to expand
StatusDeploying across the portfolio
Go inside the spec ↓ Capital partners
II

Powered Land

Foundation

Sites entitled, energized and delivered to the PowerPad standard: the land layer under every pad. Select sites exit outright to operators, developers and institutional buyers.

Sites7+ under development
Pipeline700+ MW tracked
StatusAcquiring, entitling, energizing
What is powered land? →
TPDS is a private Texas company. Detailed materials are shared only with verified accredited investors through the investor portal. Nothing on this page is an offer of securities.
03 — Inside PowerPad
Level 01 / 04
Swipe
Level 01 · The Standard

One specification.
Stamp and repeat.

PowerPad is a single engineered standard — civil, water, fiber, medium voltage, controls and entitlements — delivered identically on every site. Buyers diligence the standard once, not the site.

Diligence onceDrawings, specs and commissioning records repeat
Procure in bulkIdentical iron, interchangeable across the portfolio
Expand laterPre-engineered so Phase 2 is an equipment order
↓ Keep scrolling to go deeper
PowerPad — Reference Site Plan
MIN 4 ACRES CLEARED & LEVEL — PRE-ENGINEERED FOR FULL BUILD-OUT 1 2 3 4 5 6 7 8
1  12″ reinforced slab, 500 PSF
2  Crane pad 40′×40′, 600 PSF
3  24′ access road, 80k lb GVW
4  Modular MV transformation, 110% oil containment
5  480V landing zones
6  Fiber entry
7  8′ fence, automated slide gate
8  Hydrant within 300′ of slab
The TPDS advantage — diligence the standard once. Every site repeats it.
Level 02 · Scope & Interfaces

Delivered to
the boundary.

TPDS scope ends where the tenant's begins — with every interface pre-engineered and infrastructure commissioning complete through energization before handoff.

AGraded pad, 12″ reinforced slab, crane and heavy-haul access
BWater, sanitary and hydrant coverage; closed-loop cooling prep
CDark fiber, carrier-neutral meet-me point
DModular MV transformation, on-site MV distribution, distributed LV landing zones
ERevenue-grade metering, EPMS, SCADA and security conduit
FZoning, permits, SB6 disclosure and clean title
Single-line reference
MV DISTRIBUTION SERVICE MODULAR MV TRANSFORMATION ONAN/ONAF · N+1 · FULL BUILD-OUT MV SWITCHGEAR — MAIN-TIE-MAIN · 15–34.5 kV CLASS METAL-CLAD · DRAW-OUT VACUUM · CT/PT METERING 2.5 MVA2.5 MVA 2.5 MVA2.5 MVA 480 V480 V 480 V480 V UNIT SUBSTATIONS SCALED TO TENANT TOPOLOGY — MODULAR OR TRADITIONAL
Tenant: UPS / BESS Gensets Cooling plant PDU / busway BMS / DCIM Fiber

TPDS pre-engineers the interfaces: an MV genset tie-in bay, structural and controls provisions for the cooling plant, and submeter positions at every landing zone.

Strategic behind-the-meter partners deliver gensets and BESS ahead of market lead times — pre-secured orders and existing inventory.

Level 03 · Speed to Power

Weeks, not years.

Time-to-energization is the binding constraint in every data center transaction. Staying at the distribution level and under the 75MW threshold keeps the transmission queue off the critical path.

012 MO24 MO 36 MO48 MO60 MO TRANSMISSION-CONNECTED LARGE LOAD · 75MW+ 36–60 MONTHS — STUDY, QUEUE, UPGRADE, BUILD TPDS POWERPAD DISTRIBUTION · SUB-75MW 8–12 WEEKS — MODULAR, FROM LEASE EXECUTION
Ranges reflect published ERCOT large-load interconnection timelines and TPDS engineering targets for distribution-connected sites. Site-specific timing is confirmed in diligence.
Level 04 · Scalability

Energized at 25.
Pre-engineered to expand.

Every site energizes at 25MW with transformer capacity for the full build-out installed on day one — engineered for rapid modular deployment, equally ready for traditional builds. The expansion path is designed in from the start.

PHASE 1 — ENERGIZED 25 MW · IA EXECUTED · COMMISSIONED 0 MW25 MW PHASE 2 — PRE-ENGINEERED EXPANSION EXPANSION PATH ENGINEERED FROM DAY ONE FULL BUILD-OUT STRIKE POINT — 25 MW SERVING-READY, EXPANSION FILED
Pre-positioned iron

Modular MV transformation, N+1 by design — capacity for full build-out installed day one.

Distributed low voltage

Unit substations scale with tenant topology — modular or traditional; pads and duct banks for full build-out go in day one.

Expansion by design

Civil, containment and controls sized for full build-out at initial construction.

Exit at the strike point

Energized capacity with a pre-engineered expansion path is what buyers diligence fastest.

04 — The Firm

Entitle. Power. Exit.

Vertically integrated across acquisitions, legal, engineering and construction — so entitlement, interconnection and delivery run on one schedule, under one accountable team.

I Entitle

Rezoning through final permitting on established municipal relationships. Right-sized footprints clear in months, not years.

II Power

Executed interconnection agreements, confirmed capacity, MV infrastructure delivery and commissioning through energization.

III Exit

Diligence-grade packages delivered to neoclouds, developers and institutional buyers on compressed timelines.

Steve Brecher · CEO / COO Ayub Yousef · CTO Brandon Bolin, Esq. · Head of Legal Michael Mayes · Head of Development
Meet Leadership
05 — Capital

Accredited investor access.

Platform documentation and portfolio updates are shared directly with verified accredited investors. No financial projections are published on this site.

Portfolio7+ sites under development
Pipeline700+ MW tracked
StructurePrivate placement · accredited only
Request Portal Access
Insights
New Powered Land for Modular Compute
The asset class behind modular data centers and AI factories, defined.
01 What Is Powered Land?
What actually qualifies, and why utility-confirmed capacity commands a premium.
02 Speed to Power
Why time-to-energization is the binding constraint on every deal.
03 The Sub-75MW Advantage
What SB6's large-load threshold means for interconnection.
04 ERCOT Interconnection
Transmission versus distribution paths, step by step.