Glossary.

The terms that carry weight in powered-land transactions, defined the way they're used in diligence.

Powered land

Real property with secured, utility-confirmed electrical capacity — at minimum an executed interconnection agreement, at best an energized and commissioned substation.

Interconnection Agreement (IA)

The binding contract in which a utility commits capacity and terms of service to a specific site. The dividing line between marketing language and powered land.

ERCOT

Electric Reliability Council of Texas — the independent operator of the Texas grid, covering about 90% of the state's load.

Distribution vs. transmission

Two tiers of the grid. Distribution serves loads under standard utility processes; transmission-level connection puts a project into the multi-year large-load study queue.

SB6 (Texas, 2025)

The Texas law that created the large-load interconnection framework — enhanced studies, disclosure and curtailment provisions — for loads of 75MW and above.

Large load

Under SB6, a site with aggregate demand of 75MW or greater, subject to the enhanced large-load framework.

MW / MVA

Megawatts measure real power delivered; megavolt-amperes measure apparent power equipment must carry. Transformers are rated in MVA, tenant contracts in MW.

MV distribution service

Utility distribution service delivered at medium voltage, distributed on-site at 34.5kV and stepped to 480V at unit substations.

Unit substation

A packaged 34.5kV-to-480V transformer and switchgear assembly serving one landing zone. PowerPad sites deploy standardized 2.5MVA unit substations scaled to the tenant's topology.

Main-tie-main

A switchgear arrangement with two incoming mains and a tie breaker, letting either source carry the full bus during maintenance or a fault.

N+1

Redundancy sizing: one more unit than the load requires, so a single failure never interrupts service. The reason two smaller units beat one large one.

Commissioning (L1–L5)

The five-level test sequence from factory witness through integrated systems testing. TPDS infrastructure is commissioned through energization (L1–L3); L4–L5 complete with the tenant fit-out.

Dark fiber

Installed but unlit fiber optic strands leased to a tenant, who supplies their own optical transport equipment. Diverse entries mean two physically separate routes into the site.

Meet-me point

A carrier-neutral location where tenant and carrier fiber interconnect — no single carrier controls access to the site.

DWDM

Dense wavelength-division multiplexing — running many independent channels over one fiber pair, how tenants scale bandwidth on leased dark fiber.

Entitlement

The bundle of governmental approvals — zoning, platting, permits — that lets a site be developed for its intended use. Cleared before TPDS calls a site deliverable.

Ground lease

A long-term lease of land (and here, its power infrastructure) where the tenant owns its improvements. The structure behind the PowerPad deployment model.

EPMS / SCADA

Electrical power monitoring and supervisory control systems — the instrumentation layer that makes a site's performance observable and auditable.

Reg D

A family of SEC exemptions under which private offerings may be made to accredited investors without public registration.

PowerPad

The TPDS engineered site standard: civil, water, fiber, medium voltage, controls and entitlements delivered identically on every site. Go inside the spec →